Experienced in extremely demanding and aggressive schedules, LORD and its time proven pre-fab /BIM integrated project deliver ... y method, have constructed highly complex piping manifolds, amongst many other terminal components, on time, under budget, and with the utmost quality for various petroleum products distribution facilities over the past 5 years. Over 15 miles of large bore carbon steel piping including over 5,000 welds have been self-performed in record time in 2014 alone, thus making LORD the “go-to” hydrocarbons contractor in South Texas and Puerto Rico. In recent months LORD has had active participation in the design build activities for several clients including the installation of piping from 1/2” thru 24” in diameter for ultra-low sulfur diesel, jet fuel, fuel oil, ethanol, natural gas, gasoline, butane and propane systems, lateral distribution piping to tanks and their respective connections to tanks, main manifold pumps installation, process instrumentation installation and structural steel works for piping supports Including valve access walkways. Some of our projects have included: • Terminal Dock Pipe Installation, Large Bore Piping Installation Over Water for Multiple Petroleum Products Transmission • Interconnecting Large Bore Piping, and Corresponding Valving Installation for Petroleum Products Distribution • Main Manifold Piping, Large Bore Piping, Pumps, Structural Steel, Electrical I & C for Main Distribution Center • Main Electrical Power Distribution and Instrumentation Installation for Petroleum Distribution Control Center • LPG Phase 1 Project, Bullets, Spheres, Manifold and Piping with Corresponding Valving, Piping, Structural, Foundations and Electrical / Instrumentation and Control Installation for 30+ tanks • Diesel, Gasoline, Jet Fuel Distribution Piping Installation for 6 Storage Tanks Including Valving, Gauging, and I&C • Refrigerated LPG Piping, Structural Supports and Equipment Installation read more
Competitor | Description | Similarity |
---|
Loading..